Technical Audit of Construction Projects

Since company formation in 1987, clients have looked to Lowther-Rolton for risk management services and our in-house developed system of third party assurance, the Technical Audit.

“Marine Warranty Surveyor” assurance is a staple in the shipping world, and a similar technique is increasingly popular for onshore activities, particularly in high risk environments such as those we encounter in the Oil, Gas and Energy construction sectors. Lowther-Rolton developed this Technical Audit process at the request of several major refiners as a means to lower their incident rate.

The Technical Audit is a thorough and holistic review of the technical proposals of specialist construction Contractors, crane and transportation equipment suppliers, and Process equipment designers. The office based study identifies and addresses errors, omissions and interface issues, providing a positive resolution to each and every engineering aspect of the plan. Only when risk has been sufficiently engineered out in the office environment is the plan transferred into the operational phase.

The Technical Audit then continues at site, when Lowther-Rolton attend operations to ensure adherence to agreed plans, or to efficiently undertake Management of Change procedures when altered circumstance or environment drive a change.

This review method has been acknowledged to significantly reduce errors, delays, incidents and re-work. By engaging Lowther-Rolton, our Client does not transfer any liability to themselves from their contractors, but does satisfy their duty of care responsibility.

During turnaround planning we noticed that by using a tailing frame platforms could be pre-installed on the vessel, saving crucial hours in the shutdown schedule. Lowther-Rolton prepared the frame design and Audited the final product designed by others.
During turnaround planning we noticed that by using a tailing frame platforms could be pre-installed on the vessel, saving crucial hours in the shutdown schedule. Lowther-Rolton prepared the frame design and Audited the final product designed by others.
The Module was lifted close to minimum radius using an unusual crane configuration and at nearly 100% of crane capacity. Lowther-Rolton managed the weighing operations using twi different systems to ensure all lift data was correct and that the operation could be completed safely.
The Module was lifted close to minimum radius using an unusual crane configuration and at nearly 100% of crane capacity. Lowther-Rolton managed the weighing operations using twi different systems to ensure all lift data was correct and that the operation could be completed safely.

Why use a Third Party Assurance service?

Effectively Lowther-Rolton’s Technical Audit (T/A) provides a unique layer of protection, significantly reducing risk during critical Construction activities.

The direct benefits of a Technical Audit include:

Lowther-Rolton’s Technical Audit identified sections of the route which needed civil improvement to make this transport feasible. Fill and steel plate were added to reduce the cross-fall on road sections.

What tasks are our Engineers and Project Managers doing when they are engaged in a Technical Audit?

The scope of an audit can be quite broad, but some of the key activities which lead to safer, optimized operations will include checks on:

Routes and Work Areas: We will assess the work location, whether in a marine environment, construction site, public location or other. Aspects such as quay height, ground strength, underground services, overhead obstructions, clearance to electrical wires, crossfall and gradient on roads, changes in elevation, tight turns and permitting requirements must all be assessed.

While much of this comes down to simple geometry, the challenge frequently lies in precise communication of weights and dimensions, ensuring the size/weight of cargo, the capability of construction equipment, and the requirement for engineered civil and other preparation tasks have been understood and combined into a fully engineered, practical scheme which can be implemented as planned – without any unpleasant surprises.

Interfaces: Lifting and transport companies are engaged in load movement on a daily basis. Many projects proceed without a review process such as Lowther-Rolton’s Technical Audit and the hard truth is that many times equipment is mobilized to a location, only to find that conditions and tasks to be performed are not able to be performed as they had been anticipated.

Because of this and rightly so, these Contractors exclude site conditions and the design characteristics of loads to be moved from their responsibilities.

This is where the Lowther-Rolton is acknowledged by our Clients to result in superior outcomes each time we are engaged, because our experience allows us to assess the complete picture. The next sections explain why.

Operational plans: We will assess operational plans to ensure that the process equipment and work area combined with the construction equipment and planned sequence of events presents a workable solution to every operation to be carried out.

Equipment specifications: We will check that the construction equipment has been definitively specified, with matching geometry and capacity in both operational documents and manufacturer’s documentation. Both should be available and details should be consistent between documents. While this may seem obvious, it is frequently found that inconsistent data can become included in technical documentation, sometimes with the potential for significant detrimental influence on the outcome of the planned operation.

The Refinery management cancelled the Project due to safety concerns about lifting over live equipment. After hearing about Lowther-Rolton’s track record, the Project engaged us to undertake a Technical Audit. By satisfying the requirements of the Refinery Leadership Team, we got the Project back on track.

Process Equipment: Lowther-Rolton will ensure that the design of pressure vessels, modules, power generation equipment and all other loads is suitable to sustain the stresses placed upon them in each of the planned load cases from point of manufacture, to point of installation. Our Professional Structural Engineers shall analyze the structures, support modes and dynamic conditions imposed. This study of the interface between the load being moved and the equipment doing the moving ensures that no damage shall be incurred to our Client’s valuable equipment by the planned handling modes.

We will ensure that the loads imposed on the ground are adequately spread to meet the allowable ground pressure at the location(s). To do this we will use software to check the loads generated, structural checks on the load spreading and interpretation of any geotechnical data available for the location.

We will check that the planned operations may be completed using specified construction equipment within the manufacturer’s specified limits and in the precise configuration planned.

Far from being an inactive reviewer, we proactively seek improvements to the plan presented to protect safety or reduce schedule and cost.

The above are merely examples of Technical Audit advantages. In reality each Project presents a unique set of opportunities and challenges.

The direct benefits of the Technical Audit and how they are derived are outlined above; however there are a myriad of Secondary Benefits which may be obtained from Lowther-Rolton’s involvement in a Project.

During the planning phase the proposed crane changed, and Lowther-Rolton’s engineers got to work to develop the new scheme, ensuring a safe operation could be conducted within the expected schedule.
Lowther-rolton’s design checks uncovered that the Reactor skirt and basering design was for tailing by crane, and would be subject to plastic deflection when supported by a trailer mounted tailing frame. Stiffening was designed, checked and added to the Reactor to ensure no damage ensued during the installation.

What are the secondary benefits of a Technical Audit?

The above are merely examples of Technical Audit advantages. In reality each Project presents a unique set of opportunities and challenges.

The direct benefits of the Technical Audit and how they are derived are outlined above; however there are a myriad of Secondary Benefits which may be obtained from Lowther-Rolton’s involvement in a Project.

Proactive management: While the Audit is initially a review of the work of others, we frequently become project partners with our Client, preparing original proposals to the benefit of safety or efficiency, adding far more value than a passive or less experienced reviewer.

We shall also seek to maintain flexibility by considering alternative schemes, and avoiding methods which severely limit the range of equipment that can be employed. Our Clients have come to appreciate this aspect as occasionally the unexpected happens and plans change. It is in these times that a readily available contingency plan is a saving grace!

Tender process support: Our participation in the tendering process for heavy lift Contractors leads to successful and economical contracts.

Transparency and clarity: Because sometimes when the fog of war descends, only an independent party can clear up the ensuing confusion! Major Construction Projects are complex and present problems of communication and understanding. Whether to clear up the fog, or maintain clear lines of communication right from the start, Lowther-Rolton will make sure to keep everyone from Process Equipment designers through to the riggers and operators on site on the same page.

Improved Constructability: Being an independent of the construction Contractors, Lowther-Rolton have no conflict of interest and promote our Client’s interests throughout, seeking the most economical and flexible solutions, not dependent on the equipment or methods favored by a particular Contractor or equipment supplier.

Thorough planning: In the phase leading up to implementation, we will ensure that the optimal solutions adopted are correctly engineered and aligned to match the Project’s safety, schedule, budget and quality goals.

Client team gains confidence in the success of operations: The term assurance is not one we use lightly. It has been acknowledged by our Client project management teams that when they have full confidence in the planning process for safety critical lifting and transport operations, it provides overall benefits to the project.

Safe execution of critical lifts ensures that facility and corporate management maintain confidence in the Project

Client team is free to pursue higher Project goals: While Lowther-Rolton are assuring the success of the heavy lift and transport, our Client’s project management team are able to attend to their tasks without being hung up on technical details of the operations.

No Project is too big or too small for Lowther-Rolton, contact us today Professional Engineering services in every phase of construction planning,

Learn more about how we can help your next project

What Can You Expect From Us

First Party Design

Project Management

Third-Party Verification Services

Sectors Served

learn more about our scope of services

Services of Interest:

Logistics

ASK US ABOUT:

  • Movement from manufacturer to point of installation
  • Selection of transport and lifting methods
  • Procurement support/technical evaluation of Contractor proposals
  • Optimized module weights and dimensions
  • Lifted loadouts
  • Roll-on/Roll-off operations
  • Barge operations, stowage, lashing and ballasting
  • Bridge strength
  • Rail Car loading and securement
  • Feasibility studies
  • Loadout and stowage drawings
  • Lashing and Securing calculations
  • PE sealed design packages
  • Technical site supervision by our experts
  • Third Party review and Technical Audit
  • Trans-shipment

Transport

ASK US ABOUT:

  • Transporter stability calculations
  • Cargo securement
  • Transporter axle loads and ground pressure
  • Route survey and bridge strength
  • Route upgrades and civil improvements
  • Rail Car loading and securement
  • Feasibility studies
  • Transport drawings
  • Trans-shipment using Gantry
  • PE sealed design packages
  • Technical site supervision by our experts
  • Third Party review and Technical Audit
  • Roll-on/Roll-off operations
  • Procurement support/technical evaluation of Contractor proposals

Construction

ASK US ABOUT:

  • Crane selection and availability, capacity
  • Lift plan drawings
  • Rigging arrangements
  • Ground bearing pressure study
  • Allowable wind speed checks
  • Alternative lifting methods (lift systems, jacking/skidding, gantry)
  • Installation using SPMT
  • Third Party review and Technical Audit
  • Proof load test requirements
  • Procurement/Contractor selection support
  • Construction sequence and schedule
  • Technical site supervision by our experts
  • Modularization
  • Procurement support/technical evaluation of Contractor proposals
  • OSHA compliance checks

Design

ASK US ABOUT:

  • PE sealed design packages
  • Design and analysis of special structures
  • Transporter stability calculations
  • Transporter axle loads and ground pressure
  • Lift plan and rigging drawings
  • Rigging calculations & rigging component design
  • Analysis of temporary load cases for load movement
  • Outrigger and crawler loads
  • Allowable ground bearing pressure
  • Third Party design checks
  • 3D structural modelling and FEA
  • Crane mats and loadspreading calculations
  • ASME/OSHA/British Standards compliance
  • Pressure vessel and lifting attachment design
  • Strand jack and tower lift system design