Client: BP IRAQ/ RUMAILA OPERATING (ROO)
Project Name: DESALTER STATIONS, RUMAILA FIELD
Locations: REMOTE LOCATIONS IN IRAQ
Scope of Work description:
Lowther-Rolton played a critical role in adapting the Vessel design to accommodate load movement and installation equipment and to reshape the installation methods during the Project, leading to an improved and more economical methodology being adopted for this work which was undertaken in remote locations and considered the scarcity of load movement equipment available within the region.
Our scope of work included assisting the Vessel designers, concept engineering the installation methods through Technical Auditing through to attendance during load-out/shipping/load-in, land transport and installation.