Heavy Lift for Wind Power Project

Lowther-Rolton completed an assignment to provide Lift Plans for a Wind Farm Project in Texas, where over 40 towers shall be installed using cranes of up to 1000 tons capacity. To accommodate the Client’s schedule, the entire document set of 60 lift plans was completed and issued over a period of 11 business days.

Lowther-Rolton is the premier independent  engineering consultancy for Heavy Lift & Construction Engineering, providing original in-house design and third party verification services.

More to explore