Modularization – Optimize or Maximize?
Construction of a nickel mine and processing plant in New Caledonia did not progress effectively using traditional construction techniques, and the Owner sought alternatives. Lowther-Rolton
LOWTHER-ROLTON ENGINEERING FOR TRANSPORT OPERATIONS
Lowther-Rolton assisted our Client prepare for a complex five-day move of this 850 ton Condensation Tower over a 50km route. The move was particularly challenging
PLANNED ENGINEERED LIFTS USING OVERHEAD CRANES
Lowther-Rolton regularly assists our clients when they need to make an engineered lift plan. This means making a lift where the lift is in excess
Heavy Lift for Wind Power Project
Lowther-Rolton completed an assignment to provide Lift Plans for a Wind Farm Project in Texas, where over 40 towers shall be installed using cranes of
BP Whiting Modernization Project 2009-2014 (VIDEO)
Contracted to BP as independent 3rd party Technical Auditors and advisors for all transportation and heavy lifting proposals together with the associated engineering aspects, including
BP Castellon Refinery – Revamp Project Vacuum Column Installation 2016-2018 (VIDEO)
A Peer Review Report was commissioned by BP Oil España (BP) and prepared by Lowther-Rolton to assess the Heavy Lift and Transportation (HLT) planning issued