Absorber Vessel Delivered and Safely Installed
Lowther-Rolton Assists Client to Enhance Safety with Enhanced Construction Techniques During this project, the 595 metric tonne Absorber vessel arrived at Darwin, Australia, where it was discharged by ship’s gears onto a Goldhofer draw-bar trailer for onward transportation. It was self-offloaded and jacked up approximately 1.8m using the trailer onto support stools for final dressing. […]
Absorber Vessel Delivered and Safely Installed Read More »